Ghost Action 1.0b9 released
Yet another version of Ghost Action has been released with a number of bug fixes:
- The columns can no longer be selected.
- Resizing the window wouldn’t correctly resize the width of the project column in the project window.
- A crash could occur during synchronization if a to do in iCal was moved between calendars AND changes were made in the name of the to do AND the calendar originally containing the to do were deleted.